07.6.10

Mike tore out the Styrofoam insulation in the hunter’s shed.   Electricity is turned on.  Got the permit for the metal shed.  Need to get the site graded.

I put down black plastic to solarize beds in the East Propagation Field.  Need to get one more roll of plastic.  Have 6 beds laid out.